Integrated systems delivery · 2025

OBANA.
Engineered as one.

A landmark heavy-lift jack-up, unified by intelligent control, safety and communications systems.

Explore the vessel
The actual OBANA heavy-lift jack-up vessel at the Damen shipyard

OBANA · Damen Shipyard, Rotterdam

2,000tonne crane

Complex offshore engineering.
One integrated response.

Created by merging two repurposed jack-ups with a new central section, OBANA demanded systems that could perform as one across an extraordinary vessel.

Monitor Systems delivered the control, monitoring, safety and fibre infrastructure—from engineering and build through installation and commissioning.

One vessel.
Four connected systems.

Explore the digital twin to see how stability, safety, fibre infrastructure and proven jacking-system monitoring work together across OBANA. Rotate the vessel or select a numbered system marker.

Technical visualization of the OBANA heavy-lift jack-up vessel
Loading digital twin 0%

Dimensionally scaled digital twin

01

Vessel stability + integrity

Preload control, tank gauging & watertight doors

One integrated control environment gives operators a clear, live view of the vessel's stability and watertight integrity.

~1,800 I/O points
  • Preload and tank-level monitoring
  • Watertight-door status and alarms
  • Redundant PLC and SCADA architecture

Confidence,
engineered in.

Every enclosure, interface and connection was designed to maximise safety, operability and maintainability in a demanding offshore environment.

View the original case study
400+offshore days
3,500+engineering hours
3,000+I/O points delivered
48core fibre backbone